View IFB /PQ / REOI / RFP Notice Details
Procuring Agency Details:
Amendment / Corrigendum Detail
Amendment / Corrigendum No. : 2
|
Amendment / Corrigendum Text : |
<p><strong>"Annual Frame work contract" 1.</strong>Contractor is <strong>not </strong>eligible to claim any <strong>ideal charges</strong> and work must be carried out as an when required by the client <strong>2.</strong>No<strong> mobilizatio</strong>n and <strong>material advances </strong>will be given<strong>3.</strong>Contractor needs to deposit a<strong> performance security</strong> of Nu<strong>.10,00,000.</strong><strong>4.</strong>The <strong>Credit line</strong> is Nu.<strong>25,00,000.</strong><strong>5</strong>.The items mentioned in BOQ (for <u><em><strong>Sl.no 49</strong></em></u>. and <u> <em><strong>Sl.no 50</strong></em>.</u>) shall not be considered during evaluation<strong>6.</strong>Payment will be done after submission of bill along with the site inventory of workdone.<strong>7.</strong>The rates of all the work items should be valid upto the end of June 2022</p> |
Amendment / Corrigendum No. : 1
|
Amendment / Corrigendum Text : |
<p>The Defect Liability Period for the Annual Frame work contract "Improvement of drain, foothpath and construction of water chamber at various location within south, Thimphu" will be for one year after the completion of contract period. Therefore the retention amount of 10% for every work order will be deducted from the contractor's bill.</p> |